Structural sections
Universal beams and columns, channels and angles: the frame of a building.
A new electric arc furnace steel mill for the UK, built to run on renewable power. First steel planned for 2029.
A new era of electric steelmaking
Recycled UK steel, melted with electricity and reforged to help build UK’s future
More UK steel. More UK jobs. Less carbon.
The project
Our site will be announced shortly. From there, consents and construction lead to first steel.
We thank the UK Government for the UK Steel Strategy and the frameworks that support it, from the National Wealth Fund to faster grid connections and planning reform. Together, they make new investment in UK steelmaking possible.
Products
Building with Greensteel products
Using steel framing can mean faster construction and less structural weight. Factory-made components arrive ready for assembly, while lighter frames can reduce the demands placed on foundations.
Speed
In one UK office study, the steel frame went up 12 weeks faster than concrete.
Weight
Concrete frames weigh about half as much again. A lighter frame needs smaller foundations.
Impact
Powering the furnace
Our electric arc furnace runs on electricity. Greensteel’s advanced power electronics allow it to draw power from the grid and make use of renewable energy from wind and solar, supported by battery storage.
Lower carbon steelmaking
World-leading, low-carbon green steel. An electric arc furnace running on recycled steel emits around a quarter of the carbon of the blast furnace route.
CO2e per tonne of crude steel. World Steel Association global averages, 2024.
less CO2e per tonne than the blast furnace route.
of CO2 avoided for every tonne of recycled steel used.
recycled steel is possible in an electric arc furnace.
Building a circular steel economy
Every year the UK generates 10-11 million tonnes of scrap steel, but only around 20% is recycled into new steel. Greensteel will help close the loop, turning recycled steel into new steel for UK infrastructure.
Jobs
Seven in every ten tonnes of steel the UK uses are imported, and the skilled work goes with them. Every tonne forged here keeps jobs, wages and skills in UK communities.
of skilled jobs at the mill, and many more in construction and the supply chain.
higher pay at UK steelmakers than local median wages.
of UK demand met by UK steel: the Government's aim, up from 30%.
Operators, metallurgists, engineers, maintenance, automation, quality and logistics.
Apprenticeships, retraining and partnerships with colleges and universities.
The ability to make the steel the UK needs, in the UK, whatever happens to global supply.
Steel you can verify
Every Greensteel product will be traceable from production to project, via a digital passport: where it was made, what from, its certificates and its verified emissions.
Greensteel United Kingdom
Tell us about your project, your specification, or your interest in supplying recycled steel, partnering or working with us.