Your questions, answered.
What is a long product?
Steel whose cross-section continues along its length. Our proposed range covers structural sections (universal beams, universal columns, parallel flange channels and angles), round bars and sheet piles.
What is the steel passport?
A digital record for every product: where and how it was made, what it was made from, its certificates and its verified emissions per tonne. It will be read from a code on the product label, ready for embodied carbon reporting and procurement.
Why an electric arc furnace?
It melts recycled steel with electricity, without a blast furnace or coke ovens. The UK Steel Strategy concludes that electric arc furnaces are the most viable decarbonised form of production.
What feedstock will the mill use?
Recycled UK steel, known in the industry as scrap, will be the primary feedstock, sourced and graded with UK recyclers. For grades that need lower residual elements, it is supplemented with iron units, as the Strategy notes is required for certain grades.
Will you supply wind towers or fabricated frames?
No. Tubular tower shells use plate, which is outside our range. For wind energy we plan to supply round bars for shafts and anchor bolts, and sections for platforms, substations and ancillary structures. Steelwork contractors fabricate sections into frames.
Will the steel perform like conventional steel?
The target is steel that meets the relevant grade and application specification. Properties come from chemistry, processing and testing, and every cast is released against its specification with an inspection certificate.
How much lower will the carbon footprint be?
We will publish product carbon data in independently verified EPDs and in every passport, with a defined unit, boundary and method. Until then we quote only published averages for each steelmaking route.
Where will the mill be?
We are in the final stage of evaluating sites across the UK, and look forward to announcing our site.
When can I order, and what should I send?
The project is in development and a supply date is not yet confirmed. Early conversations help: products, grades, sizes, volumes, programme and documentation.